We have a supply of fresh water both from the well and from a mains source. At the moment, the mains source goes to one outdoor tap and one indoor tap in one of the cottages. There are no toilets or bathrooms, just a stone sink in each of the two cottages. Our first job is to install a 'fosse' or septic tank. This will initially  involve digging a hole about ten feet deep and ten by ten wide. Oh, the joys of simple, back-breaking work!
Until we have a toilet, we will live with a chemical loo in a caravan. There is a decent public toilet at the Mairie in Bar if we begin to hanker after luxury.
There is an electrical supply to the two cottages and one of the barns. This seems to supply one light bulb in each of those buildings.
And the thing that's worrying me most at the moment is the cat... what on Earth will Polly make of all this?

Comments

Popular posts from this blog

The tower finds itself in high demand

The sad ending we never expected to see

Renavoidance?